Operations
Home / Operations
NEO operates and holds interests in high quality UK North Sea assets offering organic growth opportunities, including infill drilling and development of discoveries close to existing infrastructure. We aim for a balanced portfolio of production, development and low risk exploration assets.
FILTER
Locations (25)
Boa
The Boa field was developed as part of the wider Alvheim area development, with four subsea development Explore more
The Boa field was developed as part of the wider Alvheim area development, with four subsea development wells tied-back to the Alvheim FPSO.
Neo equity: | 11.4% |
First production: | 2008 |
Block: | UK Blocks 9/15a & 9/15b and Norway Block 24/6 |
Sector: | North Sea, straddling Norway/UK median line |
Hydrocarbons: | Oil & Gas |
Alba
Alba is a heavy oil field. Its facilities include a fixed steel platform (the Alba Northern Platform), Explore more
Alba is a heavy oil field. Its facilities include a fixed steel platform (the Alba Northern Platform), and a Floating Storage Unit, the first to be purpose built for the UK sector of the North Sea.
Neo equity: | 17% |
First production: | 1994 |
Block: | 16/26a |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Babbage
The Babbage field produces high quality gas from five horizontal multi-fracced wells. The Babbage platform Explore more
The Babbage field produces high quality gas from five horizontal multi-fracced wells. The Babbage platform is operated as a Not Permanently Attended Installation (NPAI) with temporary living quarters for up to 30 persons on board during well interventions operations, maintenance or annual shutdowns. The platform is controlled remotely from Dimlington. There are spare well slots available for future expansion.
Neo equity: | 60% |
First production: | 2010 |
Block: | 48/2a |
Sector: | Southern North Sea |
Hydrocarbons: | Gas |
Golden Eagle
The Golden Eagle Area Development (GEAD) consists of the Golden Eagle, Solitaire and Peregrine oil fields. Explore more
The Golden Eagle Area Development (GEAD) consists of the Golden Eagle, Solitaire and Peregrine oil fields. The development contains a wellhead platform, and a production, utility and quarters (PUQ) platform, which are connected by a 70m bridge.
Neo equity: | 31.56% |
First production: | 2014 |
Block: | 14/26a & 20/1 |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Scott
The Scott field is located on the southern flank of the Witch Ground Graben in the Outer Moray Firth Explore more
The Scott field is located on the southern flank of the Witch Ground Graben in the Outer Moray Firth basin. Scott was developed as a twin steel platform complex, with platform drilling covering 28 slots.
Neo equity: | 5.16% |
First production: | 1993 |
Block: | 15/21a |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
The Telford field produces via a 10 km subsea tie-back to the Scott platform.
Neo equity: | 2.36% |
First production: | 1991 |
Block: | 15/21a |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Dumbarton
Part of the Quad 15 area, the Dumbarton field is tied back to the Global Producer III (GPIII) FPSO via Explore more
Part of the Quad 15 area, the Dumbarton field is tied back to the Global Producer III (GPIII) FPSO via subsea manifolds.
Neo equity: | 100% |
First production: | 2007 |
Block: | 15/20a 15/20b |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Balloch
Part of the Quad 15 area, the Balloch field is tied back to the Global Producer III (GPIII) FPSO via Explore more
Part of the Quad 15 area, the Balloch field is tied back to the Global Producer III (GPIII) FPSO via subsea manifolds.
Neo equity: | 100% |
First production: | 2013 |
Block: | 15/20a |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Lochranza
Part of the Quad 15 area, the Lochranza field is tied back to the Global Producer III (GPIII) FPSO via Explore more
Part of the Quad 15 area, the Lochranza field is tied back to the Global Producer III (GPIII) FPSO via subsea manifolds.
Neo equity: | 100% |
First production: | 2010 |
Block: | 15/20a 15/20c |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Affleck
Affleck was discovered by Shell in 1975. The primary reservoir is Tor chalk formation with a small gas Explore more
Affleck was discovered by Shell in 1975. The primary reservoir is Tor chalk formation with a small gas cap. The field was developed via two horizontal production wells tied back to the then Maersk-operated Janice field, 28 kilometres to the west. Oil was routed via Janice into the Norpipe pipeline, and Gas was routed via the Clyde platform and onwards to the Fulmar gas line to St Fergus. The Affleck field ceased production in May 2016 and the Affleck wells have remained closed in since then after producing a total of 4.3mmbblofoil. Work is currently ongoing to assess host options for the redevelopment of the Affleck field with a tie-back to two potential host facilities. The redevelopment would make use of the existing infrastructure still in place at Affleck.
Neo equity: | 100% |
First production: | 2009 (ceased production) |
Block: | 30/19a |
Sector: | Central North Sea, six kilometres from the UK/Norway median line |
Hydrocarbons: | Oil & Gas (ceased production) |
Download the
Public Notice for Advertisement 25th Aug to 26th Sept
Download the Affleck Re-development Summary of the project
Download the Affleck Re-development Environmental Statement
Close
Download the Affleck Re-development Summary of the project
Download the Affleck Re-development Environmental Statement
Britannia
Britannia field is currently produced by 33 wells from the main platform and a further 5 from the subsea Explore more
Britannia field is currently produced by 33 wells from the main platform and a further 5 from the subsea manifold tied back to the platform. Facilities comprise a fixed steel platform incorporating drilling rig linked by bridge to a satellites processing platform. Gas is exported to SAGE system St Fergus and liquids to Forties FPS.
Neo equity: | 8.97% |
First production: | 1998 |
Block: | 15/29a, 15/30a, 16/26a, 16/27a,16/27b |
Sector: | Central North Sea |
Hydrocarbons: | Gas & Condensate |
Finlaggan
Finlaggan is a 2 well tie back to Britannia platform. Gas is exported to SAGE system, St Fergus and Explore more
Finlaggan is a 2 well tie back to Britannia platform. Gas is exported to SAGE system, St Fergus and liquids exported to Forties FPS.
Neo equity: | 100% |
First production: | Q4 2021 |
Block: | 21/5c |
Sector: | Central North Sea |
Hydrocarbons: | Gas Condensate |
ETAP
Mungo is a satellite normally unmanned platform to ETAP CPF and Monan is a subsea tie-back to the ETAP Explore more
Mungo is a satellite normally unmanned platform to ETAP CPF and Monan is a subsea tie-back to the ETAP CPF. The CPF processes fluids from Marnock, Machar, Mungo, Monan, Mirren and Madoes. In future, Seagull (operated by Neptune) will also flow through the CPF. Oil from the CPF is exported to Forties Pipeline system and gas exported via CATS to Teeside.
Neo equity: | Mungo 12.65%, Monan 12.65% & CPF 4.76% |
First production: | CPF (1998) & Mungo & Monan (1998) |
Block: | Mungo 23/16a, Monan 22/20d |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Bacchus
Bacchus is a subsea tie-back to the Forties field via Forties Alpha. Oil exported to FPS. Explore more
Bacchus is a subsea tie-back to the Forties field via Forties Alpha. Oil exported to FPS.
Neo equity: | 20% |
First production: | 2012 |
Block: | 22/6c |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Cormorant is a subsea tie-back to North Cormorant platform.
Neo equity: | 40% |
First production: | 2013 |
Block: | 211/21a |
Sector: | Northern North Sea |
Hydrocarbons: | Oil |
Western Isles
The Western Isles is producing from two oil fields, Harris and Barra. It involves a subsea development Explore more
The Western Isles is producing from two oil fields, Harris and Barra. It involves a subsea development of production and water injection wells tied back to an FPSO.
Neo equity: | 23% |
First production: | 2017 |
Block: | 210/24a & 210/24e |
Sector: | Northern North Sea |
Hydrocarbons: | Oil |
Penguins
Penguins is a redevelopment project in the Northern North Sea. Existing wells (currently shut-in) and Explore more
Penguins is a redevelopment project in the Northern North Sea. Existing wells (currently shut-in) and 8 new wells will be tied into a new Sevan 400 FPSO. Gas will be exported to SEGAL and oil will be via tanker offloading.
Neo equity: | 50% |
First production: | 2003 |
Block: | 211/13a, 211/13Fa, 211/14 and 211/08 |
Sector: | Northern North Sea |
Hydrocarbons: | Oil |
Nelson
Nelson produces via a fixed steel platform. Gas is currently exported to via the Fulmar Gas Line and Explore more
Nelson produces via a fixed steel platform. Gas is currently exported to via the Fulmar Gas Line and oil is exported via the Forties Pipeline System.
Neo equity: | 21.23% |
First production: | 1994 |
Block: | Unitised between 22/6sB, 22/7a NELS, 22/11a NELS and 22/12a NELS |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Shearwater
Shearwater is an HP-HT field producing via fixed steel platform and a separate wellhead platform. The Explore more
Shearwater is an HP-HT field producing via fixed steel platform and a separate wellhead platform. The Shearwater infrastructure acts as a hub for other fields, namely Fram, Scoter, Meganser and Starling. Baroli is an extended reach well drilled from the platform, which has the same owners group as Shearwater. Third party production is planned from Arran and Columbus, due onstream in 2021. Gas is currently exported to Bacton via SEAL pipeline, however this is being re-routed in 2021 to feed into the Fulmar Gas Line to St Fergus. Condensate is exported via GAEL pipeline into the Forties Pipeline System.
Neo equity: | 44.5% |
First production: | Shearwater 2000, Baroli 2016 |
Block: | 22/30b and 22/30e (Shearwater 8 Baroli) |
Sector: | Central North Sea |
Hydrocarbons: | Gas condensate |
Fram & Starling
Starling is a three well subsea development tied back to the Shearwater platform. Fram is a two well Explore more
Starling is a three well subsea development tied back to the Shearwater platform. Fram is a two well subsea tie-back to Starling. Fram shares its infrastructure with the Starling field.
Neo equity: | Fram 68%, Starling 72% |
First production: | Starling 2007, Fram 2020 |
Block: | Fram is located in 29/3c, 29/8a, 29/4c and 29/9c & Starling is located in 29/3a |
Sector: | Central North Sea |
Hydrocarbons: | Gas condensate |
Elgin-Franklin
Elgin-Franklin (including West Franklin & Baroli) are a series of HP-HT fields producing via a fixed Explore more
Elgin-Franklin (including West Franklin & Baroli) are a series of HP-HT fields producing via a fixed steel platform and a series of separate wellhead platforms. Gas is currently exported to Bacton via the SEAL pipeline and condensate is exported via GAEL pipeline into the Forties Pipeline System.
Neo equity: | 4.38% |
First production: | 2001 |
Block: | 29/5c, 29/5b, 22/30b and 22/30c |
Sector: | Central North Sea |
Hydrocarbons: | Gas condensate |
Gannet
Gannet is a cluster of six oil fields producing via the Gannet A platform. Its facilities comprise a Explore more
Gannet is a cluster of six oil fields producing via the Gannet A platform. Its facilities comprise a fixed steel platform at Gannet A with subsea tie-backs from clusters B, C, D, F &G. Gas is exported to SEGAL system and oil exported to Teesside via Norpipe.
Neo equity: | 50% |
First production: | 1992 |
Block: | 21/25b, 21/30b & d, 22/21a & b and 22/26a |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Culzean
Culzean is an HP-HT gas and condensate field that was discovered in 2008. It is located in the Central Explore more
Culzean is an HP-HT gas and condensate field that was discovered in 2008. It is located in the Central North Sea. Culzean was developed using three bridge-linked platforms including a 12-slot wellhead platform (WHP), a central processing platform (CPF) and a separate living quarters and utility platform (ULQ). From the CPF, liquids are exported to the Ailsa Floating Storage Offloading (FSO) vessel, for onward shuttle tanker loading. Gas is exported via the Central Area Transmission System (CATS) to the terminal facilities at Teesside.
Neo equity: | 18.01% |
First production: | 2019 |
Block: | 22/25a |
Sector: | Central North Sea |
Hydrocarbons: | Gas condensate |
Mariner
Mariner is a heavy oil field, located in the Northern North Sea, 100 kilometres east of the Shetland Explore more
Mariner is a heavy oil field, located in the Northern North Sea, 100 kilometres east of the Shetland Islands. It was discovered in 1981 and sanctioned in 2012 following new seismic and technologies. Mariner has been developed with a fixed platform, tied back to a floating storage unit (FSU) The field has two reservoirs: the Tertiary Maureen Sandstone and the shallower Heimdal Sandstone. Oil from the Mariner development is tanker loaded for export.
Neo equity: | 20% |
First production: | 2019 |
Block: | 8/15a, 9/11a |
Sector: | Northern North Sea, East Shetland Platform |
Hydrocarbons: | Oil |
Buchan
Redevelopment of the Buchan Field. The Buchan field is located in the Central North Sea, 115 km northeast Explore more
Redevelopment of the Buchan Field. The Buchan field is located in the Central North Sea, 115 km northeast of the Aberdeenshire coastline. The proposed project involves installation of new subsea production gathering infrastructure tied back to a redeployed Floating Storage Offloading (FPSO) vessel; the Western Isles FPSO. Oil will be offloaded from the Western Isles FPSO via shuttle tanker and excess gas will be exported via a new gas export pipeline.
Neo equity: | 50% |
First production: | Q4 2026 |
Block: | 20/05a and 21/01a |
Sector: | Central North Sea |
Hydrocarbons: | Oil |
Download the
Buchan Redevelopment Project Public Consultation Notice
Download the Buchan Redevelopment Project Environmental Statement
Download the Download the Buchan Redevelopment Project Summary
Close
Download the Buchan Redevelopment Project Environmental Statement
Download the Download the Buchan Redevelopment Project Summary